I will do risk assessment, method statement, inspection and test plan, load calculation
Civil Engineer QAQC ISO 9001:2015 Lead Auditor
About this Gig
I offer professional construction engineering and technical documentation services for civil, structural, infrastructure, pipeline, and industrial projects. I can prepare clear, detailed, and project-specific documents suitable for contractor, subcontractor, consultant, and client review and approval.
Services I Provide:
1. Method Statements
Preparation of detailed method statements covering scope of work, responsibilities, required manpower and equipment, materials, work sequence, construction methodology, quality requirements, inspection requirements, and HSE controls.
2. Inspection & Test Plans (ITP)
Development of project-specific ITPs including inspection stages, acceptance criteria, applicable specifications and standards, testing requirements, Hold Points, Witness Points, Review Points, and responsible parties.
3. Load Calculations
Preparation of engineering load calculations for applicable construction and temporary works, including equipment loads, lifting arrangements, structural loads, temporary supports, and other project-specific requirements.
4. Risk Assessment & Risk Management
Preparation of comprehensive risk assessments with hazard identification, risk evaluation,
Document type:
Documentation
Industry:
Construction
Language:
English
•
Hindi
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.

