I will create and manage project schedules in primavera p6
About this Gig
Are you looking to get your project completed on time and within budget? A poorly structured logic network is the quickest way to face delays, cost overruns, and contractual disputes.
As an experienced Project Planning Engineer, I will develop a robust, dynamic, and professionally optimized Primavera P6 timeline tailored specifically to your project's scope, whether it is in construction, infrastructure, or oil and gas.
What I Need to Get Started:
Project Scope of Work (SOW) or Work Breakdown Structure (WBS)
Project Start Date and any hard constraints or milestones
List of activities, durations, and logic dependencies (if available)
Resource list and cost budget (for resource-loaded plans)
Scope of Services (What You Get)
WBS Creation: A clean, hierarchical Work Breakdown Structure to organize deliverables.
Activity Sequencing: Logic-linked planning using the Critical Path Method (CPM) with realistic relationshipscompletely free of open ends.
Critical Path Analysis: Identification of the driving path, total float, and potential project bottlenecks.
Resource & Cost Loading: Allocation of labor, material, and budget to track earned value management (EVM).
Domain:
Business
Industry:
Architecture & interior design
•
Construction
Language:
English
•
Urdu
•
Other
