I will be your expert UK electrical tender, boq, cost estimation for UK tender bids
Bridging the Gap Between Architectural Vision and Fiscal Reality
About this Gig
Expert UK Electrical Estimator | Professional BOQ & Tender Bid Specialist
Are you a UK-based electrical contractor looking to win more tenders without the stress of manual counting and pricing?
I provide accurate, data-driven Electrical Cost Estimations and Bill of Quantities (BOQ) tailored specifically for the UK market. With over 6 years of experience, I help contractors submit competitive, profitable bids that align with NRM2 standards and BS 7671 regulations.
What I Offer:
- Comprehensive Take-offs: Precise measurement of cables, containment, switchgear, and accessories from your PDF/CAD drawings.
- Detailed BOQ: Itemized schedules prepared using industry-standard software (SEC, Trimble, or Excel).
- Labour & Material Analysis: Current UK market rates for materials and standardized labour constants.
- Tender Management: Assistance with ITT (Invitation to Tender) documents and technical queries.
- Sub-contractor Liaison: Coordination with specialist suppliers (Fire Alarms, CCTV, Data) to ensure a complete bid.
Why Choose My Service?
- UK Standard Compliance: Deep understanding of the UK construction landscape.
- Accuracy Guarantee: I minimize "hidden costs" to protect your profit margins.
Project scale:
Building
Building type:
Residential
•
Commercial
•
Hospitality
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
Other Building Engineering Services I Offer
FAQ
Which UK standards do you follow for measurement?
I primarily follow the NRM2 (New Rules of Measurement), which is the standard for building works in the UK. This ensures your BOQ is professional, transparent, and easily understood by Quantity Surveyors and Main Contractors.
What software do you use for estimations?
I utilize professional estimation software and advanced digital take-off tools to ensure 100% accuracy. Final reports are usually delivered in Excel or PDF format, depending on your preference.
Do you include specialist systems like Fire Alarms or Data?
Yes. In the Standard and Premium packages, I can incorporate quotes from your preferred specialist subcontractors or provide provisional sums based on the project specifications.
Can you handle "Design and Build" (D&B) tenders?
Absolutely. If the drawings are incomplete, I can use my engineering background to provide a "Scope of Works" estimate based on typical UK design requirements for that sector.
How do you handle site-specific "Preliminaries"?
For Premium projects, I include a section for Prelims (scaffolding, site management, insurance, etc.), which are often overlooked but critical for protecting your bottom line.

