I will provide evacuation simulation, fire safety analysis


1 order in queue
About this gig
Need to know how people will actually move through your building in an emergency? I build detailed evacuation simulations that model occupant flow through exits, stairwells, and corridors, then bring it to life with full 3D animation so you can literally watch the evacuation unfold, revealing bottlenecks, total evacuation time, and whether your design meets safety codes before it's ever tested in real life.
What you'll get:
- 3D animation of the full evacuation
- Complete evacuation time analysis with phase breakdowns
- Congestion heat maps showing bottleneck points
- Clear design recommendations to fix weak spots
- Code compliance insights (NFPA, IBC, or local standards)
- A clean, stakeholder-ready report
Perfect for:
- Offices, malls, and schools
- Hospitals and high-rises
- Stadiums, transit hubs, and any high-occupancy space
I don't just export numbers. I turn your simulation into a clear 3D visual and practical decisions you can act on.
Please message me with your building details and requirements before placing an order so I can understand your project and give you an accurate quote.
Get to know Zaylen
Architect, Draftsman, Visualizer, Fire dynamic Simulation
- FromPakistan
- Member sinceMay 2024
- Avg. response time1 hour
- Last delivery5 days
Languages
Urdu, English
My Portfolio
FAQ
What software do you use for the evacuation simulation?
I run every evacuation simulation in Pathfinder, the industry-standard tool for occupant movement and evacuation analysis, which gives you accurate, code-defensible results.
What do I need to send you to start the evacuation simulation?
Just share your floor plans (CAD, PDF, or images), occupancy numbers, and exit details. From there I build the Pathfinder model and run the full evacuation analysis for your building.
Will I get the 3D animation along with the analysis?
Yes. Every evacuation simulation includes a realistic 3D Pathfinder animation plus a complete analysis report covering evacuation time, bottlenecks, and design recommendations.
Can your evacuation simulation check code compliance?
Absolutely. My Pathfinder analysis compares your evacuation times against NFPA, IBC, or your local standards, so you know exactly where your building stands.
How long does the evacuation simulation take to complete?
Turnaround depends on building size and complexity, but most Pathfinder evacuation simulation and analysis projects are delivered within a few days. Message me your requirements for an exact timeline.

