I will prepare swppp plans for npdes and construction stormwater permits


About this gig
I can work from your site plans, grading plans, civil drawings, survey information, project specifications, jurisdiction requirements, and other available documents.
My services can include:
- SWPPP plan preparation
- NPDES permit documentation support
- Construction General Permit (CGP) support
- Erosion control plans
- Sediment control plans
- Erosion & sediment control (ESC) plans
- Construction site BMP layouts
- Silt fence and inlet protection layouts
- Sediment basin and sediment control details
- Temporary and permanent erosion control
- Stormwater pollution prevention details
- Stormwater management documentation
- Notice of Intent (NOI) support
- SWPPP updates and revisions
- Permit ready stormwater drawings
My goal is to provide clear, organized, project specific SWPPP and stormwater compliance documentation that is easy for contractors, developers, engineers, and permitting teams to review.
Service verification and delivery style preference
Fiverr does not screen freelancers in this category. Please verify qualifications and discuss requirements with the freelancer before ordering, including any preferences regarding the use of AI tools.
Get to know Arthur Currie
Structural Engineer
- FromUnited States
- Member sinceAug 2026
Languages
English
FAQ
What is included in your SWPPP service?
I can prepare project specific SWPPP documentation covering erosion control, sediment control, construction BMPs, stormwater pollution prevention measures, site stabilization, construction sequencing, and related permit support information based on the project scope and requirements provided.
Can you prepare an NPDES related SWPPP?
Yes. I can provide SWPPP and NPDES permit support documentation based on the project information and applicable requirements supplied by the client or permitting authority.
Can you create an erosion and sediment control plan?
Yes. I can prepare erosion control, sediment control, and ESC plan layouts showing applicable construction BMPs such as silt fence, inlet protection, stabilized entrances, sediment-control measures and other project-specific practices.
