I will do material take off, mto and quantity survey from drawings
Professional Electrical Design Draftsman, AutoCAD, MEP and ELV Systems
Level 2
Has met high performance criteria and has a proven track record for meeting client expectations.
About this Gig
Accurate Material Take-Off (MTO) & Quantity Survey from Drawings
Need precise quantities extracted from your electrical/ELV drawings? I provide accurate, well-organized material take-offs ready for your procurement or estimating team.
What I Offer:
- Material Take-Off (MTO) from AutoCAD or PDF drawings
- Itemized BOQ (cables, conduits, devices, panels, fixtures, fittings)
- Organized by floor, system, or category however you need it
- Cross-checked against drawing legends and device schedules
- Clean Excel deliverable, ready for your pricing team
️ Important: I provide quantities only. I do not include pricing, unit rates, or cost estimation this service is purely for accurate quantity extraction from your drawings.
Why Work With Me:
- Electrical Design Draftsman with hands-on drafting experience I read drawings the way they're meant to be read, not just counted symbols
- Detail-focused, double-checked quantities
- Fast turnaround, clear communication
Software Used:
AutoCAD | Excel
Message me before ordering with your drawing files and preferred BOQ format (by floor, by system, or combined) for an accurate quote and timeline.
Building type:
Residential
•
Commercial
•
Hospitality
Software:
Microsoft Excel
•
Other
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
Other Building Engineering Services I Offer
FAQ
Do you provide pricing or cost estimates?
No — this gig is for quantity extraction only. I don't include unit rates or total costs, only accurate item counts and quantities from your drawings.
What file formats do you need from me?
AutoCAD DWG (preferred) or clear PDF drawings with legends/schedules visible.
What will I receive?
An organized Excel BOQ sheet listing all items, quantities, and units — categorized by floor, system, or however you specify.
Can you take off multiple systems (electrical + fire alarm + CCTV) together?
Yes, that's available as an add-on — just let me know all systems you need covered.
How do you ensure accuracy?
cross-check every count against the drawing's device legend and schedule, and do a second pass before delivery to catch missed items.

