I will write construction rams method statements coshh risk assessment UK tender rfp
Government Tender and RFP Proposal Writer
About this Gig
A generic RAMS document is one of the fastest ways to lose points on a construction tender evaluators can spot a template in seconds, and it signals your site planning isn't real.
I write RAMS and COSHH documentation that's specific to your actual scope of works, so it reads as genuine method planning rather than a downloaded template with your company name swapped in.
I can help with:
- Risk Assessment and Method Statements (RAMS) for specific trades and tasks
- COSHH assessments for materials and substances used on site
- CDM 2015-aligned health & safety content
- Task-specific hazard and control measure documentation
- Formatting to match the buyer's PQQ/ITT template
I work from your scope of works, site details, and materials list to produce documentation that ties directly to what you're actually pricing, not a generic pack that could apply to any site.
Send me your tender documents and scope of works, and I'll turn around RAMS and COSHH content that's ready to submit.
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
Do you visit the site?
No, documentation is prepared remotely from the scope of works and site details you provide; this keeps turnaround fast and cost low.
Are these CDM 2015 compliant?
Yes, content is structured to align with CDM 2015 principal contractor/designer duties as relevant to your role.
Can you match our own RAMS template?
Yes, send your template and I'll populate it, or use a standard format if you don't have one.
Do you cover COSHH for specific materials?
Yes, list the materials/substances used and I'll produce assessments for each.

