I will make method statement, swms, rams, site specific safety plan, hns policy

4.9
4.9

Pakistan

I speak English, Urdu, Arabic

436 orders completed

Gig Summary

ll MS Civil ll ll QHSE Consultant ll ll Risk Assessment Expert ll

Serving 300+ unique clients and delivering over 600 projects Worldwide, I am an M.Sc. Civil Engineer, Certified QHSE Consultant, with over 11 years of experience in Construction, Engineering, Industri...

Level 2

Has met high performance criteria and has a proven track record for meeting client expectations.

About this Gig

With 200+ unique Clients and over 500 completed projects Worldwide, I prepare professional Method Statements, RAMS, SWMS, CPP, AHA, HSE Manuals, Site-Specific Safety Plans, HACCP Plans, Risk Assessment for Processing, Manufacturing, Industrial, and Construction sectors.

 

I am an M.Sc Civil Engineer, HSE Consultant, QA/QC Manager with 10+ years of professional experience in the Construction, Engineering, Industrial, & Manufacturing sectors worldwide

 

It includes:-

  1. Risk Assessment Method Statement
  2. Safe Work Method Statement
  3. Operations and Maintenance (O&M) Manuals
  4. AHU and Housekeeping Manuals
  5. Traffic Management Plan
  6. OSHA, IOSH, COSHH, WHS and NBC Safety Reports
  7. Monthly HSE Reports
  8. Activity Hazard Analysis (AHA)
  9. Risk Assessment (RA)
  10. Health and Safety Plan
  11. Site-Specific Safety Plan (SSSP)
  12. Health & Safety Policy 
  13. Emergency Response Plan (ERP)
  14. Personal Protective Equipment (PPE) Plan
  15. Hazard Identification & Risk Assessment (HIRA)
  16. Site Health and Safety Plan (HASP)
  17. Fire Safety Management Plan
  18. Lifting Plan and Rigging Study
  19. Guaranteed approval, especially for UAE, NZ, AUS, KSA, UK, and USA. 


Please discuss your project prior to placing an order.


Thanks

Document type:

User & training manuals

•

Documentation

Industry:

General

Language:

English

Delivery style preference

Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.

Clients I’ve worked with
Kohler Co.

Kohler Co.

Industrial Manufacturing & Storage

OPERATION & MAINTENANCE (O&M) MANUAL FOR ELECTRICAL & POWER FACILITIES

Jun 2023-Jun 2023

My Portfolio

Reviews

65 reviews for this Gig
4.9

(58)
(6)
(1)
(0)
(0)
Rating Breakdown
  • Seller communication level
    5
  • Quality of delivery
    5
  • Value of delivery
    4.9
Sort By
Most relevant
  • J

    josephal24

    CA

    Canada

    Ongoing collaboration
    5

    I had an excellent experience working with Nauman on the method statement. The quality of work was outstanding, thorough, well-structured, and tailored precisely to the project requirements. He demonstrated a high level of professionalism throughout, with great attention to detail and a clear understanding...

    $50

    Price

    3 days

    Duration

    Helpful?
    Yes
    No
  • F

    fionacurran1970

    AU

    Australia

    Ongoing collaboration
    5

    Nauman was amazing to deal with. He is very polite, prompt and extremely adaptative. I changed the brief on him a couple of times, and nothing was too much trouble. He understood the changes rapidly. I can highly recommend his services.

    $100-$200

    Price

    5 days

    Duration

    Helpful?
    Yes
    No
  • N

    nooros

    GB

    United Kingdom

    Ongoing collaboration
    5

    Professional work

    $50

    Price

    1 day

    Duration

    Worksample image
    Helpful?
    Yes
    No
  • N

    nooros

    GB

    United Kingdom

    Ongoing collaboration
    5

    Excellent service

    $50-$100

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
  • D

    didsbrickwrk

    GB

    United Kingdom

    5

    I couldn’t fault this service, I got my RAMS sorted quickly and efficiently and was advised on what package was needed. Will be using again in the future.

    $100-$200

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
Reviews

65 reviews for this Gig
4.9

(58)
(6)
(1)
(0)
(0)
Rating Breakdown
  • Seller communication level
    5
  • Quality of delivery
    5
  • Value of delivery
    4.9
Sort By
Most relevant
  • J

    josephal24

    CA

    Canada

    Ongoing collaboration
    5

    I had an excellent experience working with Nauman on the method statement. The quality of work was outstanding, thorough, well-structured, and tailored precisely to the project requirements. He demonstrated a high level of professionalism throughout, with great attention to detail and a clear understanding...

    $50

    Price

    3 days

    Duration

    Helpful?
    Yes
    No
  • F

    fionacurran1970

    AU

    Australia

    Ongoing collaboration
    5

    Nauman was amazing to deal with. He is very polite, prompt and extremely adaptative. I changed the brief on him a couple of times, and nothing was too much trouble. He understood the changes rapidly. I can highly recommend his services.

    $100-$200

    Price

    5 days

    Duration

    Helpful?
    Yes
    No
  • N

    nooros

    GB

    United Kingdom

    Ongoing collaboration
    5

    Professional work

    $50

    Price

    1 day

    Duration

    Worksample image
    Helpful?
    Yes
    No
  • N

    nooros

    GB

    United Kingdom

    Ongoing collaboration
    5

    Excellent service

    $50-$100

    Price

    1 day

    Duration

    Helpful?
    Yes
    No
  • D

    didsbrickwrk

    GB

    United Kingdom

    5

    I couldn’t fault this service, I got my RAMS sorted quickly and efficiently and was advised on what package was needed. Will be using again in the future.

    $100-$200

    Price

    1 day

    Duration

    Helpful?
    Yes
    No