I will do quantity takeoff, boq and construction scheduling
Construction Contracts and Project Management Consultant
About this Gig
I provide professional construction quantity takeoff, BOQ preparation, WBS development and construction scheduling for residential, commercial and infrastructure projects.
My service is designed for contractors, consultants, developers, quantity surveyors and project teams who need clear, reviewable and practical project-control deliverables.
I can assist with:
Quantity takeoff from drawings and specifications
BOQ preparation and organization
WBS development
Construction schedules and milestones
Relative weights and progress measurement structure
Linking BOQ items to WBS and schedule activities
Excel-based quantity and control sheets
Review of quantities, activities and sequencing
Project monitoring and reporting structure
Deliverables depend on the selected package and project scope.
Please contact me before ordering for large or complex projects, especially projects involving multiple disciplines, extensive drawing sets or detailed MEP takeoff.
For accurate pricing, please provide the available drawings, BOQ, specifications and required level of detail.
Domain:
Consulting
Industry:
Construction
•
Engineering
Language:
Arabic
•
English
My Portfolio
FAQ
1. What documents do you need to start?
Please provide the available drawings, BOQ, specifications, scope of work and any existing schedule or project requirements.
2. Which construction disciplines can you cover?
I can work with architectural, structural and MEP project information. The exact disciplines included depend on the selected package and agreed scope.
3. Do you provide quantity takeoff for a complete building?
Yes, but the price depends on the number of drawings, project size, disciplines and required level of detail. Please contact me before ordering a full-project takeoff.
4. What software or file formats will you deliver?
Quantity and BOQ outputs are normally delivered in Excel. Scheduling outputs can be provided in an agreed format depending on project requirements.
5. Can you link the BOQ to the construction schedule?
Yes. For the applicable package, I can organize BOQ items into a WBS and link them to schedule activities to support progress measurement and project monitoring.
6. Are cost estimates included?
This Gig focuses on quantity takeoff, BOQ, WBS and scheduling. Detailed pricing or cost estimation is not included unless specifically agreed before ordering.

