I will florida erp drainage plans and swppp site engineering
structural and civil engineer
About this Gig
Facing a Water Management District RAI or need fast Florida ERP drainage and SWPPP plans?
With Floridas updated ERP stormwater regulations requiring strict nutrient loading (TN/TP) reductions alongside water quantity attenuation, minor modeling errors cause months of permitting delays. I prepare accurate Florida ERP drainage plans and SWPPP site engineering tailored for SFWMD, SWFWMD, and SJRWMD compliance.
What I Deliver:
- Stormwater Modeling: Pre- and post-development runoff routing (HydroCAD / ICPR) & retention/detention sizing.
- Nutrient Loading Calculations: Total Nitrogen (TN) and Total Phosphorus (TP) treatment train analysis per current FDEP rules.
- SWPPP & Erosion Control: Complete Stormwater Pollution Prevention Plans, BMP details, and grading layouts.
- Culvert & Driveway Drainage: Cross-drain sizing, swale profiles, and high-water table analysis.
- RAI Resolution: Direct technical revisions to clear Water Management District review comments.
Why Work With Me?
- 2026 Rule Compliant: Built for current Florida ERP water quality and quantity standards.
- Fast Turnaround: Clear communication to keep your site development on schedule.
Message me
Project scale:
Building
Building type:
Residential
•
Commercial
•
Office & workspace
Material speciality:
Concrete
•
Steel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
Are your drainage calculations updated for Florida's new ERP nutrient modeling rules?
Yes. My calculations incorporate both water quantity attenuation and the mandatory Total Nitrogen (TN) and Total Phosphorus (TP) nutrient reduction modeling required for current ERP submittals.
Which Florida Water Management Districts do you cover?
I prepare plans and drainage reports formatted for all major Florida districts, including SFWMD, SWFWMD, SJRWMD, and NWFWMD, as well as local county engineering departments.
What do you need from me to start a SWPPP or drainage plan?
Please share your property address/parcel ID, topographic survey (DWG or PDF), proposed site layout, and any geotechnical soil boring data or agency RAI letters.
Do you help respond to Water Management District RAIs (Requests for Additional Information)?
Yes. My Standard and Premium packages include revision support to address technical drainage, grading, or nutrient calculation comments from district reviewers.
