I will do etap power system analysis, short circuit, and protection coordination
Electrical Engineer, Advanced Simulink Modeling, Technical Consultant
About this Gig
Need an IEEE-compliant Power System Analysis for a commercial facility, solar plant, or substation?
As an R&D Electrical Engineer, I model, simulate, and protect complex networks. A poorly coordinated grid causes equipment failure, nuisance tripping, and safety hazards. I deliver actionable, white-label engineering reports built to strict industry standards (IEEE, NFPA 70E, IEC).
Expertise & Services:
Network Modeling: SLD creation from raw data/AutoCAD
Load Flow Analysis: Active/Reactive power, voltage drop, losses optimization
Short Circuit Analysis: 3-phase & asymmetrical fault calculations (ANSI/IEC)
Protection Coordination: Relay coordination, CT/PT sizing, breaker selection, TCC curves Arc Flash Studies: Incident energy, hazard boundaries, PPE labels (IEEE 1584)
Motor Starting & Harmonics: Voltage dip & THD mitigation
Software Stack: ETAP | MATLAB/Simulink | DIgSILENT PowerFactory | AutoCAD Electrical
You Receive: Native simulation files (.oti / .etap / .slx) + full corporate ready PDF report.
️MESSAGE ME BEFORE ORDERING to discuss your SLD and bus count for an accurate quote!
FAQ
What software do you use for power system analysis and short circuit studies?
I specialize in ETAP, DIgSILENT PowerFactory, and MATLAB/Simulink. For industry-standard Load Flow, Short Circuit Analysis, and Relay Protection Coordination, I utilize ETAP to ensure 100% compliance with IEEE (e.g., IEEE 242, IEEE 1584), ANSI, NFPA 70E, and IEC standards.
What data or documents do you need from me before starting the simulation?
To begin, I need: 1) Your Single Line Diagram (SLD) or network layout (AutoCAD, PDF, or hand sketch), 2) Utility grid data (short circuit MVA/kVA or fault level at the point of common coupling), 3) Cable schedules (sizes, lengths, material), and 4) Transformer/Generator ratings and impedance (%Z).
What exact deliverables will I receive when the power system study is completed?
You will receive a comprehensive, corporate/publication-ready technical report in PDF format detailing all methodologies, voltage drop tables, tabulated fault currents, and Time-Current Characteristic (TCC) tripping curves. Additionally, I provide the native source simulation files (e.g., .oti)
Can you perform Arc Flash Hazard analysis and generate PPE safety labels?
Yes! As part of an advanced protection coordination study, I calculate incident energy levels, determine arc flash boundary distances, and establish Personal Protective Equipment (PPE) categories in strict accordance with IEEE 1584 and NFPA 70E safety frameworks.
My facility has more than 30 buses or complex renewable generation. Can you handle large systems?
Absolutely. Whether you have a microgrid, utility-scale solar BESS plant, or a 100+ bus industrial facility, I provide tailored R&D engineering solutions. Please send me a message with your SLD before ordering so I can review your network complexity and provide a custom timeline.