I will design solar permit plan sets, autocad sld, and nec compliant pv systems
About this Gig
Are you looking for a professional to design solar permit plan sets, draft accurate AutoCAD SLDs, and prepare NEC compliant PV systems? You are in the right place!
I specialize in producing complete, AHJ permit-ready solar drawing sets for residential and commercial solar installers across the US and worldwide. My designs strictly follow current NEC guidelines to guarantee quick utility and city approvals.
What Each Permit Plan Set Includes:
- Cover Sheet with Project Notes & AHJ Requirements
- Detailed Site Plan & PV Array Layout
- AutoCAD SLD (Single Line / Three Line Electrical Diagrams)
- DC AC Cable Sizing, Voltage Drop, & Breaker Calculations
- Structural Racking & Attachment Details
- Mandatory NEC Safety Warning Labels & Plaque Set
Why Work With Me?
- Code-Compliant Precision (NEC 2017/2020/2023 standard)
- High AHJ Approval Rate
- Fast Turnaround with editable DWG and clean PDF outputs
Contact Me Before Ordering to review your AHJ checklist, site survey details, and equipment datasheets!
Project type:
Residential
•
Commercial
•
Industrial
Solar system type:
Grid-connected
•
Off-grid
•
Hybrid
Software:
PVsyst
•
AutoCAD
•
Other
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
Will this permit plan set be accepted by my local city or city council (AHJ)?
Yes, all drawings are generated following standard U.S. NEC guidelines and typical city submission formats, including cover sheets, site layouts, wiring diagrams, and safety stickers required for city approvals.
Do you provide PE (Professional Engineer) stamps with the design?
This gig provides complete engineering drafting and electrical layout preparation. If your local building department requires a wet or digital PE stamp, you can submit these finished CAD drawings directly to a local engineer for review and stamping.
What if the city or utility requests revisions to the permit drawings?
I stand by my work. If your city building department or utility company requests corrections related to the drafting or NEC calculations, I will update the plan set promptly based on your feedback.
