I will deliver hvac cost estimation and material take off
HVAC Cost Estimator and Designer I 1000 plus Projects I 4 Years exp
About this Gig
Welcome to My HVAC Estimation Gig!
Need an HVAC construction cost estimation? You're in the right place! With two years of experience in construction estimate, I specialize in HVAC construction cost estimation, material take off, HVAC design, and quantity surveying having estimated over 700 projects with a 25% win ratio.
Services Offered:
1.Duct Material Take Off:
- Rectangular Ducts (Medium/Low Pressure, Double Wall)
- Spiral Ducts (Medium/Low Pressure, Exposed/Concealed, Double Wall)
- Flexible Ducts
- Kitchen Ducts (Black Iron Exhaust, Aluminum Dryer Vents)
- Lab Ducts (Stainless Steel Welded/Non-Welded)
- Mechanical Room and Riser Ductworks
2.Piping Material Take Off:
- Chilled/Hot Water Piping
- Condenser Water Piping
- Refrigerant and Natural Gas Piping
- Condensate Drain Piping
3.Equipment Quantities:
- VAVs, FP Boxes, Exhaust Fans
- Air Handling Units, ACs, MAUs, Mini Splits
- Diffusers, Registers, and Grilles
4.Deliverables:
- Construction cost estimation sheets with material take off and proposals for GCs
- Highlighted PDFs
- Revisions included
Lets get your HVAC construction estimate and material take off accurate and on time. Order now!
Building type:
Residential
•
Commercial
•
Industrial
Software:
Bluebeam
•
Revit
•
PlanSwift
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
Other Building Engineering Services I Offer
FAQ
What is your method to do the takeoffs?
I do my takeoffs manually with the help of Scale Master device. Also I can use bluebeam and planswift
What software you use for the takoff?
Manual Take offs with scale master tool and Bluebeam or Planswift
How fast you can deliver?
The delivery time depends on the length and scope of project, for small project i can deliver quickly.
What is the process and timeline for revisions?
Most small revision requests are completed within 24 hours. For larger or more complex changes, I’ll confirm the exact time needed before starting.
How accurate are your HVAC estimates?
With over 700 projects estimated and a proven 25% win ratio, my estimates are highly accurate. I follow industry-standard take-off methods to ensure precision.
2 reviews for this Gig
| (2) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Quality of delivery
- Value of delivery
Sort By
S shamiro

Curaçao
Very good if not one of the best! Highly recommended. Went above and beyond our expectations and delivered for us on time. Was always willing to cooperate and deliver on time. Trustworthy, professional, communicative. If we could give him 10 stars or more we would.
$200-$400
Price
1 day
Duration
Helpful?C cgnlcgnl

United States
Hammad went above and beyond to make sure I get what I wanted and more. He is my go-to on HVAC job, I wouldn't even look any further. A start of many with Hammad, I look forward to working with him over and over again. A perfect experience I must say. Keep it up.
Up to $50
Price
4 days
Duration
Helpful?
2 reviews for this Gig
| (2) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Quality of delivery
- Value of delivery
Sort By
S shamiro

Curaçao
Very good if not one of the best! Highly recommended. Went above and beyond our expectations and delivered for us on time. Was always willing to cooperate and deliver on time. Trustworthy, professional, communicative. If we could give him 10 stars or more we would.
$200-$400
Price
1 day
Duration
Helpful?C cgnlcgnl

United States
Hammad went above and beyond to make sure I get what I wanted and more. He is my go-to on HVAC job, I wouldn't even look any further. A start of many with Hammad, I look forward to working with him over and over again. A perfect experience I must say. Keep it up.
Up to $50
Price
4 days
Duration
Helpful?

