I will create professional construction schedule in primavera p6
About this Gig
I will prepare a professional construction plan in Primavera P6 based on your drawings, BOQ, scope of work, and project requirements.
Services I Offer:
- P6 Planning
- WBS & Activity Creation
- Activity Relationships
- Project Calendar
- Milestones
- Critical Path Method
- Baseline
- Gantt Chart
- Resource Loading
- Cost Loading
- Progress Updates
- Project Reports
Projects I Can Work On:
- Residential Buildings
- Commercial Buildings
- Villas & Housing Projects
- Roads & Highways
- Infrastructure Projects
- Renovation Projects
- Civil Construction Projects
What You Will Receive:
- Primavera P6 file
- Organized activity plan
- Gantt Chart
- WBS and milestones
- Activity relationships
- Critical path
- Baseline, according to package
- PDF report, where applicable
Please provide your drawings, BOQ, project duration, start date, or existing P6/XER file if applicable.
Contact me before ordering for large or customized projects.
Domain:
Business
Industry:
Construction
•
Engineering
Language:
English
•
Urdu
•
Pashto
My Portfolio
FAQ
Q: What information do you need to create the schedule?
I normally need project drawings, BOQ or scope of work, project start date, required duration, and any available activity or resource information.
Q: Can you create a schedule from drawings and BOQ?
Yes. For larger or detailed projects, I can develop activities and the schedule based on the available drawings, BOQ, and project scope.
Q: Will I receive the Primavera P6 file?
Yes. The Primavera P6 project file can be provided according to the selected package and project requirements.
Q: Can you update an existing Primavera P6 schedule?
Yes. I can update an existing P6 schedule based on actual progress, revised dates, or client requirements.
Q: Can you prepare a baseline schedule?
Yes. Baseline scheduling is included in the Standard and Premium packages.
Q: Do you provide resource and cost loading?
Yes. Resource and cost loading are available in the Premium package or can be added as an extra for suitable projects.
Q: Can you schedule large construction projects?
Yes. Please contact me before ordering large or complex projects so I can provide a customized offer.
Q: Do you provide a Gantt chart?
Yes. A Gantt chart is included with the construction schedule.

