I will make technical drawing and 2d cad drafting in solidworks
About this gig
A drawing is only useful if the shop can build from it and an inspector can verify it. I write drawings that pass both tests.
I work as a CMM programmer and quality control technician. I inspect parts against drawings every day, which means I know exactly which datums, tolerances and callouts cause problems on the shop floor - because I am the one who finds them.
HOW IT WORKS
1. You send me your 3D model, sketch or existing drawing, and tell me what the part has to do.
2. I define the datum scheme first, around how the part will actually be held and measured.
3. I dimension every feature and apply GD&T to ISO 1101 where it matters.
4. General tolerances are stated per ISO 2768, never left to assumption.
5. You receive a PDF for reading, plus DWG and DXF you can edit and send to a supplier.
WHY THIS MATTERS
Most drawings fail quietly. A tolerance is unmeasurable, so the inspector approximates it, so the part ships, so it fails in the field. I build the datum structure first so that never happens.
WANT TO TALK FIRST?
For anything complex, I am happy to have a short call before you order. It saves both of us time.
WHAT I NEED FROM YOU
A 3D model in STEP, IGES or SLDPRT, or a leg
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
Get to know Ivan Basic
CMM Programmer SolidWorks Arduino Python Automation
- FromCroatia
- Member sinceApr 2020
- Avg. response time1 hour
Languages
Croatian, English
My Portfolio
Other Industrial & Product Design Services I Offer
FAQ
Do you work in ISO or ASME?
Both. Tell me which standard your supplier expects and I will follow it exactly.
What if I do not have a 3D model?
A legible hand sketch with dimensions is enough. I can also build the 3D model first - message me and I will send a combined offer.
Can you add balloon numbers for first article inspection?
Yes. I number them in the order an inspector would actually measure them, which saves time on the shop floor.
Why does the datum scheme matter so much?
Because it decides whether the part can be verified at all. A tolerance nobody can measure gets approximated, and that is how bad parts pass inspection.

