I will provide electrical permit drawings, load calculation and full permit set
About this Gig
Struggling to get your electrical permit approved in Connecticut,
Maryland, or Indiana? I handle the full package from electrical
permit drawings to a complete, full permit set stamped by a
licensed engineer and ready for city submission.
Every project includes a thorough load calculation covering
service sizing, breaker ratings, and circuit distribution per
NEC code and your local jurisdiction requirements. Your
electrical permit drawings are formatted exactly how Connecticut,
Maryland, and Indiana building departments want to see them
clean, code-referenced, and rejection-proof.
What's inside every full permit set:
- Electrical permit drawings floor plan + wiring layout
- Load calculation sheet (NEC Article 220 compliant)
- Single line diagram (SLD) and panel schedule
- PE stamp from a licensed engineer registered in your state
- Site plan and electrical layout
- Structural engineer notes where required by AHJ
- Formatted for Connecticut, Maryland, or Indiana submission
Whether you're a contractor, homeowner, or developer, your
full permit set and load calculation will be reviewed and stamped
by a licensed engineer, and delivered permit-ready.
Project scale:
Building
Building type:
Residential
•
Commercial
•
Office & workspace
Material speciality:
Concrete
•
Steel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
Do your electrical permit drawings meet Connecticut, Maryland, and Indiana building department requirements?
Yes. Every set of electrical permit drawings is formatted specifically for the AHJ (Authority Having Jurisdiction) in Connecticut, Maryland, or Indiana including correct title blocks, state-specific code references, and a PE stamp from a licensed engineer registered in your state.
What exactly is included in the full permit set?
The full permit set includes electrical permit drawings, a complete load calculation per NEC Article 220, a single line diagram, a panel schedule, a site plan, and a PE stamp from a licensed engineer. Everything is organized and labeled for direct submission to your local building department.
Why is a load calculation required for my permit?
A load calculation confirms your electrical system can safely handle the total demand service entry sizing, branch circuits, and panel capacity. Most Connecticut, Maryland, and Indiana building departments require a signed load calculation as part of the full permit set before issuing an electrical
Do I need a structural engineer review for my project?
It depends on the scope. If your project involves load-bearing modifications, additions, or structural changes, structural engineer documentation is required. This is included in the premium package or available as an add-on to the standard full permit set.
What do I need to send you to get started?
To prepare your electrical permit drawings and load calculation, send me your property address and state (CT, MD, or IN), floor plan or sketch with dimensions, existing panel details if it's a renovation, and any notes from your contractor. Message me first; I'll confirm the exact requirements

