I will do mechanical hvac, plumbing takeoff and cost estimation
Estimator for US Contractors, Takeoffs, BOQs and Bid Prep
About this Gig
Inaccurate MEP estimates are costing you bids or days of your time.
I deliver fast, precise HVAC & Plumbing takeoffs and cost estimates for mechanical contractors, GCs, and developers. With 3+ years as a professional estimation engineer, I know ductwork, piping, and fixtures inside out.
WHAT YOU GET:
Detailed quantity takeoff (duct, pipe, fittings, fixtures, equipment)
Material & labor cost breakdown in PDF + Excel
Annotated / marked-up mechanical plans
Organized by CSI MasterFormat (Div 21, 22, 23)
TOOLS I USE:
PlanSwift Bluebeam Revu Excel RSMeans-based pricing
SYSTEMS COVERED:
HVAC ductwork & equipment, plumbing piping & fixtures, hydronics, exhaust systems
WHY WORK WITH ME:
Fast turnaround (24 Hour)
Contractor-friendly, bid-ready reports
US standards, units & codes
Send your mechanical plans and get an accurate estimate. Message me before ordering large projects!
Building type:
Residential
•
Commercial
•
Industrial
Software:
Bluebeam
•
PlanSwift
•
Microsoft Excel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
FAQ
What do you need from me to start?
Upload your mechanical/HVAC/plumbing plans (PDF). Tell me the project type, location, and which systems you need (ductwork, piping, fixtures, equipment). Specs help if you have them.
What will I receive?
A detailed quantity takeoff + material & labor cost breakdown in PDF, plus an Excel source file (Standard & Premium). Premium includes bid preparation and value engineering notes.
Which CSI divisions do you cover?
Division 21 (Fire Suppression), 22 (Plumbing), and 23 (HVAC) — ductwork, piping, fittings, fixtures, and mechanical equipment, all organized by CSI MasterFormat.
How accurate are your takeoffs?
All quantities are measured directly from your plans in PlanSwift/Bluebeam. Pricing uses RSMeans-based US data — tell me your project location and I'll localize material & labor rates.
What is your turnaround time?
Basic: 2 days, Standard: 3 days, Premium: 4 days. Need it faster? Message me before ordering — rush delivery is usually possible.

