I will create earned value evm dashboard from primavera p6 with s curve
Planning Engineer, Primavera P6 Scheduling and EVM Expert
About this Gig
Want to know if your project is ahead or behind, and over or under budget?
I am a Planning Engineer based in Saudi Arabia, specialized in project controls and Primavera P6. I turn your P6 data into a clear Earned Value Management (EVM) dashboard that management and clients can understand at a glance.
What I can do:
- Earned Value analysis from Primavera P6
- PV, EV, AC calculation
- SPI and CPI performance indexes
- Time and cost variance (SV, CV)
- EAC, ETC and VAC forecast
- S-curve (planned vs earned vs actual)
- SPI / CPI trend charts
- Cost and resource loading in P6 (if needed)
- Monthly progress report in PDF
What you receive:
- Excel EVM dashboard with charts
- PDF summary report
- Updated P6 file (.XER) where cost loading is included
Please message me before ordering with your .XER file and data date, so I can check your data and recommend the right package.
Let's measure your project performance the right way!
Domain:
Data
Industry:
Data analytics
•
Other
Language:
English
My Portfolio
FAQ
Q: What do you need from me to start?
A: Your cost or resource-loaded P6 file (.XER), the data date, and actual cost if available
Q: My P6 file has no cost loading. Can you still do EVM?
A: Yes. I can load costs or resources into your P6 file first. Please add the cost loading extra.
Q: What is SPI and CPI?
A: SPI shows time performance and CPI shows cost performance. Above 1.0 is good, below 1.0 means delay or overrun.
Q: Which file formats will I receive?
A: Excel dashboard, PDF report, and updated .XER file where cost loading is included.
Q: Can you update the dashboard every month?
A: Yes. Message me and I will send a custom offer for monthly EVM updates.
Q: Do you work with Saudi / GCC project requirements?
A: Yes. I am based in KSA and familiar with project control reports for construction projects in the region.

