I will do residential drywall framing and insulation takeoff
Residential Quantity Takeoff And Material Estimating Expert
About this Gig
Are you a residential contractor or builder losing precious hours measuring blueprints by hand? Let a professional handle your material lists with absolute technical precision.
I specialize in providing highly accurate material takeoffs and labor estimations for residential drywall, framing, and insulation systems. Utilizing PlanSwift digital software integrated with advanced Excel automated workbooks, I deliver flawless reports that prevent material waste and secure your project margins.
### What this Gig Includes (Based on Project Scale):
* **Framing Assembly:** Wood studs (2x4, plates, construction screws) and Light-Gauge Metal Studs/Tracks (2-1/2").
* **Drywall Board Count:** 1/2" Regular Gypsum Board and 1/2" Mold & Moisture Resistant boards.
* **Insulation Breakdown:** Fiberglass Batt Insulation (R-19 for walls / R-38 for ceilings).
* **Ceiling & Suspension Systems:** Furring/Hat channels, Main runners, Wall angles, Hanger wire, and RC-1 Resilient Channels.
* **Consumibles & Trim:** Joint tape paper, joint compound (mud in gallons), corner beads, and control joints.
* **Labor Cost Estimation:** Estimated hours for Framing, Hanging, Taping & Finishing.
Building type:
Residential
•
Infrastructure
Software:
PlanSwift
•
Microsoft Excel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
FAQ
What software do you use for the takeoffs?
I use PlanSwift for precise digital on-screen takeoffs and advanced, custom-formatted Excel spreadsheets for the final Bill of Materials.
Can you handle tight bidding deadlines?
Yes! I understand how stressful the bidding phase is for contractors. I offer an Extra Fast Delivery option (24 hours) for urgent residential bids. Please message me first to confirm availability.
What if my blueprints change or have an addendum?
No problem. I offer revisions in my packages to adjust the material takeoff according to any changes made to the architectural plans.

