I will create a construction schedule in primavera p6 and ms project
Trading Software Developer and Primavera P6 Scheduler
Level 2
Has met high performance criteria and has a proven track record for meeting client expectations.
About this Gig
Need a clear construction plan that your team can easily understand and follow? I will turn your scope of work, BOQ, drawings, activity list, or existing programme into a structured Primavera P6 or Microsoft Project timeline.
Your project plan can include WBS, activities, durations, milestones, logical dependencies, baseline, CPM, critical path analysis, and a professional Gantt chart.
I can also prepare progress updates, short-term look-ahead plans, Excel activity registers, PDF reports, and editable XER or MS Project files, depending on the selected package and agreed format.
Every construction project is different. Please message me before ordering so I can review your files, confirm the deliverables, and recommend the right package.
Domain:
Business
Industry:
Construction
•
Engineering
Language:
English
My Portfolio
FAQ
1. What information do you need to start?
Please send your project scope, planned start date, required completion date, BOQ or activity list, working calendar, milestones, and any available drawings or existing schedule files.
2. Can you create a schedule from drawings or a BOQ?
Yes. I can review the available documents and prepare a proposed WBS and activity schedule. Any estimated durations, sequencing, and assumptions will be sent to you for approval.
3. Which files will I receive?
Depending on the selected package, delivery may include a Primavera P6 XER or Microsoft Project file, Excel activity register, PDF Gantt chart, and project reports. Please confirm the required format before ordering.
4. Can you update an existing project schedule?
Yes. Please provide the existing schedule, data date, actual start and finish dates, progress percentages, remaining durations, and any approved project changes.
5. Will the schedule include WBS and critical path?
Yes. The schedule can include a clear WBS, activity relationships, milestones, Gantt chart, CPM calculations, critical path, and total float.
6. Can you prepare a baseline or look-ahead schedule?
Yes. Baseline schedules, progress updates, and look-ahead schedules are available in the Standard or Premium package, depending on the number of activities.
7. Do you provide resource loading, cost loading, or delay analysis?
These services are not included in the listed packages. Please send your requirements first so I can review the scope and confirm whether a custom offer is suitable.
8. Should I contact you before placing an order?
Yes, please message me first. I will review your files, confirm the required deliverables and software format, and recommend the correct package.
1 reviews for this Gig
| (1) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Quality of delivery
- Value of delivery
Sort By
A albertsedimo

United States
Ahmed went above and beyond what I expected from him. The results of his work were just astounding and I recommend everyone to work with Ahmed. I will be coming back with more work for sure. He communicates in a timely manner as well.
$50-$100
Price
1 day
Duration
Helpful?
1 reviews for this Gig
| (1) | ||
| (0) | ||
| (0) | ||
| (0) | ||
| (0) |
Rating Breakdown
- Seller communication level
- Quality of delivery
- Value of delivery
Sort By
A albertsedimo

United States
Ahmed went above and beyond what I expected from him. The results of his work were just astounding and I recommend everyone to work with Ahmed. I will be coming back with more work for sure. He communicates in a timely manner as well.
$50-$100
Price
1 day
Duration
Helpful?
