I will design site grading plans, civil site plans for your project
About this Gig
Welcome To My Gig
Site grading and civil site plans are in strong, steady demand across the US right now Florida requires detailed stormwater management on most projects due to hurricane rebuilding and rapid population growth, while Texas and North Carolina lead the nation in new housing and site development activity needing these plans.
I design grading and civil site plans for residential, commercial, and land development projects turning raw site conditions into permit ready drawings your city or county will accept.
WHAT I DELIVER
- Site grading plans (cut/fill, slopes, contours)
- Drainage design and stormwater management plans
- Utility layout coordination (water, sewer, storm)
- Erosion and sediment control plans
- Parking, driveway, and access layout
- Permit ready civil site plan sets
WHY WORK WITH ME
Grading mistakes cause flooding, drainage complaints, and rejected permits I focus on plans that reflect real construction conditions and clear the permit process on the first submission.
Send your survey, plot plan, or site details and I'll quote a fixed price and turnaround within 24 hours.
Project scale:
Building
Building type:
Residential
•
Commercial
•
Office & workspace
Material speciality:
Concrete
•
Steel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
Do you need a survey to start the grading plan?
A topographic/boundary survey is ideal for accuracy, but I can start from a plot plan or existing site data and refine once a survey is available.
Can you stamp the site plan for permit submission?
Yes, in states where I hold an active PE license confirm your project location before ordering.
What's included in a stormwater management plan?
Runoff calculations, detention/retention sizing where required, and drainage routing that meets your local jurisdiction's requirements.
How long does a civil site plan take?
Basic grading plan: 3–4 days. Full civil site plan set with drainage and utilities: 6–8 days
Can you respond to city/county plan review comments?
I revise and resubmit based on reviewer comments as part of the project scope.
