I will draft residential ev charger and electrical panel upgrade permit plans


About this gig
Need fast, code-compliant electrical permit plans for your EV charger or service panel upgrade?
Cities frequently reject EV charger and 200A panel upgrade permits due to missing NEC Article 220 load calculations or unclear single-line diagrams. I help homeowners, electricians, and EV installers get city permit approval on the first submission.
What Is Included in Your Permit Package:
- NEC Article 220 Electrical Load Calculation Sheet
- Detailed Single-Line Diagram (SLD) & Panel Schedule
- Site & Garage Floor Plan showing charger, conduit routing, and disconnect locations
- Complete NEC Electrical Notes & Spec Sheets formatted for US permitting
Why Choose This Service:
- 24-Hour Express Turnaround built for tight installation schedules
- Delivered in print-ready PDF and editable AutoCAD (.DWG)
- Tailored for Tesla Wall Connector, ChargePoint, NEMA 14-50, and 100A-400A service upgrades
Note: This service provides professional CAD drafting and NEC load calculations. If your municipality requires a local PE stamp, files are delivered ready for your engineer's seal.
Message me with your panel amperage and charger model before ordering!
Service verification and delivery style preference
Fiverr does not screen freelancers in this category. Please verify qualifications and discuss requirements with the freelancer before ordering, including any preferences regarding the use of AI tools.
Get to know Max Dex
Civil Engineer
- FromUnited States
- Member sinceOct 2026
- Avg. response time1 hour
Languages
English
FAQ
Do you provide a PE (Professional Engineer) stamp on these drawings?
No. I provide complete, code-compliant AutoCAD drafting and NEC Article 220 load calculations formatted for US building departments. Many residential EV charger and panel upgrade permits do not require a stamp; if your local city requires one, my DWG and PDF sheets are ready for your local engineer
What information do you need from me to get started?
To start right away, please send: 1) Your property address (to verify your local NEC code cycle), 2) Clear photos of your existing main electrical panel and its breaker directory label, 3) Your EV charger brand/model (e.g., Tesla Wall Connector, ChargePoint, or NEMA 14-50), and 4) A rough sketch
Which EV chargers and electrical panel upgrades do you cover?
I draft permit sets for all Level 2 hardwired and plug-in EV chargers (Tesla, ChargePoint, Wallbox, JuiceBox, Grizzl-E, and NEMA 14-50 outlets) as well as 100A to 200A, 225A, or 400A main service panel upgrades and subpanel additions.
What file formats will I receive?
You will receive high-resolution, print-ready PDF permit sheets (standard 11"x17" or 24"x36" architectural title blocks) along with the fully layered, editable AutoCAD (.DWG) source file.
