I will draft a UK settlement demand for defective building and renovation work
UK Lawyer, Construction Disputes, Building Claims and IP Enforcement
About this Gig
Has a UK builder, contractor, or tradesperson left your home extension, loft conversion, roof, or refurbishment riddled with defective workmanship, Building Regulations failures, or unfinished worksor abandoned the site after taking heavy stage payments? You need a legally structured UK Defective Building Settlement Demand Letter that recovers the cost of putting the work right.
I am Mia Elizabeth Abel, a UK property and construction dispute lawyer representing homeowners, landlords, and developers across England and Wales.
What Your Defective Building Claim Delivers:
- Strict Statutory & Contractual Liability: Enforces the Consumer Rights Act 2015 (s.49 reasonable care and skill; s.50 information binding; s.52 reasonable time), the Supply of Goods and Services Act 1982, and the Defective Premises Act 1972.
- Court-Ready Scott Schedule of Defects (Standard & Premium): Organises every defect, surveyor/building control finding, photo reference, and replacement contractor remedial quote into the exact tabular Scott Schedule format used by UK courts.
- Cost of Cure & Consequential Damages: Claims remedial contractor costs, wasted materials, and alternative accommodation/delay losses.
Field of law:
Property
Target country:
Worldwide
Legal consulting Gigs are not screened
Please note that there is no screening process for this service. We recommend that you message the freelancer and check all necessary details before placing your order. Pro freelancers in this category have gone through a vetting process. You can find more details here.
FAQ
Do I have to let a rogue builder come back to fix dangerous or botched work
While contractors sometimes ask for a chance to snag minor items, under English case law (Mul v Hutton and the Consumer Rights Act 2015), where a builder's workmanship is so poor that you have reasonably lost trust and confidence in their competence, you can claim the cost of an independent contract
What is a Scott Schedule and why is it included in Standard and Premium
In UK building disputes, County Courts and the Technology and Construction Court (TCC) require defects to be presented in a "Scott Schedule"—a numbered table listing each Location/Element, the Exact Defect & Building Reg Breach, the Remedial Works Required, and the Cost of Rectification.
What if the builder is still demanding their final instalment for bad work
Under the common law right of abatement and equitable set-off (preserved under the Consumer Rights Act 2015), you are entitled to set off the cost of rectifying defects and completing unfinished works against any unpaid contract balance—and claim the excess back from the builder.
Does this comply with the UK Pre-Action Protocol for Construction Disputes
Yes. Whether your claim falls under the CPR Practice Direction on Pre-Action Conduct (for consumer homeowner claims) or the Pre-Action Protocol for Construction and Engineering Disputes (for commercial/development claims), I structure the Letter of Claim to satisfy court pre-action rules.
What evidence is helpful to include with my defective building demand
Any quote/contract, payment receipts, photographs of the defects, Building Control rejection notes, RICS surveyor/structural engineer inspection reports (if obtained), and 1 to 2 quotes from replacement builders showing the cost of rectifying and completing the work.