I will schedule project wbs CPM gantt chart in primavera p6
Bilingual Editor and Proofreader, English and Arabic
About this Gig
Are you starting a project without a clear roadmap? A weak plan leads to missed deadlines, cost overruns, and confused stakeholders.
I'm a Primavera P6 certified planning engineer (PMP) experienced in project timelines for engineering, construction, and industrial maintenance/turnaround work. Every deliverable includes a proper Work Breakdown Structure (WBS), a full Critical Path Method (CPM) analysis (early/late dates and float), and a clean Gantt chart with the critical path highlighted, delivered in both Excel (.xlsx) and native Primavera P6 (.xer).
What you get:
- A logically structured WBS broken into phases and deliverables
- A CPM-based timeline built on real activity relationships and durations
- Both an Excel (.xlsx) file and a Primavera P6 (.xer) file
- Clear identification of the critical path controlling your finish date
Useful for construction, engineering, industrial shutdowns/turnarounds, product launches, and any project needing a real plan.
Send me your activity list or scope and I'll turn it into a professional Gantt-based plan you can manage with confidence.
Business type:
Corporates
•
SMBs
Industry:
Construction
•
Energy
•
Engineering
FAQ
Do you deliver in Primavera P6 (.xer) or Excel?
I plan every project in Primavera P6 and deliver both a Primavera (.xer) file and a matching Excel (.xlsx) workbook, so you can use whichever your team works with.
What information do you need from me to get started?
Ideally your list of activities/tasks with estimated durations and dependencies. If you don't have this yet, share your project scope and I can help structure it.

