I will do quantity takeoff, progress claim and ipc for construction projects

China

I speak Chinese, English

Quantity Surveyor Takeoff , Progress Claims , IPC , VO , Back Charges

Quantity Surveyor with 10+ years on Commonwealth-standard projects — both main-contractor and sub-contractor sides. I measure quantities to your BOQ and prepare monthly progress claims, IPCs (Interim ...
About this Gig

Hi, I'm Serene a QS with 10+ years on Commonwealth-standard projects, main-con and sub-con side.

Full lifecycle: tender procurement monthly valuation & claims IPC (Interim Payment Certificate) VO final account. Core trades: structural works, architectural works, modular (PPVC / MiC / DfMA).


WHAT YOU GET

  • Quantity takeoff re-measure from drawings + existing BOQ, item by item
  • Sub-contractor monthly progress claim
  • IPC (Interim Payment Certificate) sub-con claims checked and certified before you pay
  • VO claim measured against contract rates, with the clause entitling you to payment
  • Back charges / contra charges prepared (main-con) or reviewed (sub-con), incl. double-charge checks
  • Editable Excel to NRM2 / SMM7 / POMI / SIA


I measure to your existing BOQ and contract rates I don't price materials or labour.


WHY ME

  • Both sides of the table I know how claims are made, checked, cut, paid
  • FIDIC (R/Y/S), JCT, NEC, PSSCOC · AutoCAD, Bluebeam Revu, Glodon, Excel
  • SG · MY · HK · UK · IE · AU · NZ + Middle East FIDIC (no US RSMeans)

Message me first with drawings, BOQ and scope fixed price within 24 hours. Small jobs get the same detail.

Building type:

Residential

•

Commercial

•

Industrial

Software:

Bluebeam

•

Microsoft Excel

•

Other

Field of expertise:

Concrete

•

Metals

•

Finishes

Delivery style preference

Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.

My Portfolio