I will do an electric motor repair vs replace report with npv and payback
Industrial B2B proposals, motor efficiency reports and tender decks
About this Gig
A motor failed. Rewind it or buy a new IE3 or IE4 motor? Most plants decide in minutes on purchase price alone, while energy over 10 years can cost many times more.
I prepare a clear, engineer-checked report that compares repair, new IE3 and new IE4 for each motor, using IEC 60034-30-1 minimum efficiencies (or your catalog values) and the U.S. DOE method.
You get:
- Annual energy use, savings in kWh, money and tCO2
- Simple payback, NPV and 10-year total cost of ownership
- Downtime cost and rewind efficiency loss included
- Clear recommendation per motor and a ranked action list
- Report in PDF + the Excel calculation so you can audit every number
Ideal for maintenance and reliability engineers, energy managers and purchasing teams that need a document management will approve.
Send the nameplate data, operating hours, energy price and quotes. Missing data? We use documented standard assumptions and flag them.
Works for 50 Hz and 60 Hz, any currency. English or Spanish.
AI-assisted tools help with layout and writing; calculations are formula-based and every result is reviewed.
Visualization Tools:
Microsoft Excel
Type of model:
Discounted cash flow
•
ROI, lease vs. buy
Industry:
Energy
•
Engineering
•
Manufacturing & storage
Target country:
Colombia
•
Mexico
•
Spain
FAQ
What if I don't know the load or efficiency?
We use documented typical values (e.g. 75% load) and flag them clearly so you can adjust.
Do you cover NEMA motors at 60 Hz?
Yes. We use your catalog efficiencies (NEMA Premium / Super Premium) instead of the IEC table.
Can I reuse the calculation?
Yes. You receive the Excel file with the formulas.
Is this a certified energy audit?
No. It is an engineering decision-support report based on your data and public standards, not a legal or compliance certificate.
Can the report be in Spanish?
Yes, English or Spanish at no extra cost.

