I will do nec electrical load calculations and single line diagrams
Electrical PE in 22 States for Design, CAD Drafting and Controls
About this Gig
Get clear electrical load calculations and single line diagrams for service upgrades, panel changes, and new loads, including EV chargers.
I'll run NEC 220 load calculations, prepare single line diagrams, and size EV chargers or service upgrades to match the package you choose. Premium adds feeder voltage-drop checks and load-management notes.
These deliverables are not sealed. They are for reference, coordination, or for your engineer of record.
My work is electrical only. Structural, roof-load, and attachment engineering are not included. I rely on the site data, photos, utility information, and equipment specs you provide, and you are responsible for their accuracy. Your local authority (AHJ) and the utility decide permit approval, and I can't promise a yes. I include reasonable revisions for AHJ comments within the original scope. To the extent permitted by law and Fiverr's Terms of Service, liability is limited to the amount paid for the order.
Project scale:
House
Building type:
Residential
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
Will these calculations be sealed?
No. These deliverables are not sealed. They are for reference, coordination, or for your engineer of record.
Does this mean my permit will be approved?
No. Your local authority (AHJ) and the utility make the final call. I'll address their comments within the original scope, but approval isn't something I can promise.
What if I don't have 12 months of utility data?
That's okay. I'll use the NEC 220.82 or 220.83 standard method instead of the 220.87 optional method. If you do have a 12-month demand history, share it and I'll use it where it's allowed and helpful.
Can you size a service upgrade?
Yes, in the Standard and Premium packages. I'll recommend a service size based on the NEC load calculation. The utility makes the final decision on the service itself.
Is this ready for a permit submittal?
These deliverables are not sealed. They are for reference, coordination, or for your engineer of record. Your AHJ decides what they need to issue a permit, so I can't promise approval.
What's your background?
I've spent 15 years in commercial and industrial power, and I review every sheet myself before it goes out.

