I will do rebar and concrete takeoff from your structural drawings for bids
Structural Design Engineer, ETABS, STAAD, AutoCAD and Excel
About this Gig
Bid due soon and the structural set just landed? I'll measure the concrete and rebar so your estimator can price the job from real quantities.
What you get:
- Excel takeoff by element: footings, grade beams, slabs, walls, columns and beams
- Colour-marked PDF sheets, so you can check every number
- Rebar weight by bar size, with laps and waste listed separately (Standard and Premium)
- Formwork contact area, a bid summary sheet and an assumptions log (Premium)
Quantities come in your units: cubic yards and tons for US work, m3 and kg everywhere else.
How it works:
1. Send the structural drawings and specs, and tell me your bid date.
2. I confirm the scope and any missing details before I start.
3. Foundations come back first, then the rest of the structure.
I only take off concrete and rebar. I read rebar callouts, laps and dowels on the structural sheets, so the numbers come from the details instead of rough allowances.
Please note: I am not a licensed engineer. Quantities are for estimating and should be checked against the final issued drawings.
Building type:
Residential
•
Commercial
•
Industrial
Software:
Microsoft Excel
•
Other
Field of expertise:
Concrete
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
Other Building Engineering Services I Offer
FAQ
Which units do you use?
Your choice. US projects get cubic yards and tons or pounds. Metric projects get m3 and kg.
Do you include laps and waste?
Rebar is reported as net weight with laps listed separately. I can add waste at your company's percentages if you send them.
What software do you use?
I measure vector PDFs in AutoCAD and build the takeoff in Excel. You also get colour-marked PDFs so you can check each quantity.
Do you take off other trades?
No. I focus on concrete and rebar, so each takeoff gets the detail it needs.
