I will write hse risk assessments and method statements for your project

R
radyhse
R
radyhse
Hesham R.

About this gig

Need an HSE document that is clear, practical and ready to use on site? I write risk assessments and method statements for construction, industrial and facilities work.


I am a QHSE and mechanical engineer with several years of hands-on HSE experience on construction and industrial projects, holding NEBOSH IGC, IOSH, OSHA and ISO 45001 training.


What you get:

- Activity hazard identification with risk rating before and after controls

- Practical control measures and responsible roles

- Step-by-step method statement (Standard and Premium)

- Toolbox talks and inspection checklist (Premium)

- Editable Word file plus PDF, in clear English


How it works:

1. Send me the activity, location and any company template.

2. I prepare the draft and send it within the delivery time.

3. You get revisions to match your site.


Basic: one activity risk assessment. Standard: risk assessment plus method statement. Premium: project pack with several activities, toolbox talks and checklist.


Message me before ordering if your work is not listed. I will confirm scope and give you a clear answer.

Get to know Hesham R.

Hesham R.

HSE Engineer for Risk Assessments and Method Statements

  • FromEgypt
  • Member sinceNov 2026
  • Languages

    Arabic, English
I am a QHSE and mechanical engineer with NEBOSH IGC, IOSH Managing Safely and OSHA certificates. I prepare practical HSE documents for construction, fire protection and facility projects: risk assessments, method statements, HSE plans and toolbox talks. Every document is clear, site specific and ready for client or consultant review. Send me your activity and site details and I will deliver a clean, professionally formatted document.