I will create primavera p6 construction schedules
I am a Professional Project managment and Planning Engineer
About this Gig
Hi, greetings!
I deliver professional project schedules using Primavera P6 and MS Project, built with CPM logic, WBS structure, and milestone tracking. Each Work Plan is optimized for construction planning, monitoring, and project control, ensuring clear deliverables, resource allocation, and progress visibility.
Basic: Small project schedule, proposal work plan, WBS, and Gantt chart. (1 days)
Standard: Full schedule with WBS & activities, CPM logic, baseline, milestones, and progress tracking. (1 days)
- Premium: Complex project scheduling, resource-based planning, optional cost loading, and fully optimized outputs. (2 days)
Why Me
- Experienced Planning Engineer
- Expertise in Primavera P6 & MS Project
- Fast, audit ready documentation
Domain:
Consulting
Industry:
Construction
•
Engineering
Language:
Arabic
•
English
•
Urdu
My Portfolio
FAQ
1. What information do you need to start the project?
I need project scope, BOQ (if available), drawings, timeline requirements, and any client-specific scheduling constraints.
2. Which software will you use?
I will use Primavera P6 as well as MS project for scheduling and CPM-based project planning.
3. Will you provide a complete project schedule?
Yes, I will deliver a complete project schedule including WBS, activities, logic links, milestones, and baseline plan.
4. Can you update an existing schedule?
Yes, I can review, correct, and update your existing Primavera P6 and Ms Project schedule as per project progress or requirements.
5. Will I receive the editable Primavera file?
Yes, you will receive the .XER file, MPP (Primavera P6 ,Ms Project editable format) along with PDF/Excel outputs if required.
6. Can you handle large and complex construction projects?
Yes, I specialize in large-scale construction planning, CPM scheduling, and project control systems.
7. Do you include resource or cost loading?
Yes, resource and cost loading are included in Standard and Premium packages (if required).
8. How long does it take to complete a schedule?
Delivery time depends on project size but typically ranges from 2 to 7 days.
9. Can you ensure logical sequencing and critical path?
Yes, all schedules are developed with proper CPM logic and critical path analysis.

