I will create professional risk assessment, method statement, jsa, hira
Senior EHS Consultant, Risk Assessment, SWMS, ISO 45001
About this Gig
Are you looking for site-specific, professional, and submission-ready Health & Safety documentation for your project?
With 18+ years of practical Environmental, Health & Safety (EHS) experience, I prepare high-quality safety documents that are customized to your work activitiesnot copied from generic templates.
I have worked on power generation, construction, oil & gas, and industrial projects, helping organizations identify hazards, control risks, and meet client and regulatory requirements.
Whether you are a contractor, consultant, project manager, or business owner, I can provide clear, practical, and professionally formatted documentation tailored to your project.
Services I Offer
- Risk Assessment (RA)
- Method Statement (MS)
- Risk Assessment Method Statement (RAMS)
- Job Safety Analysis (JSA)
- Job Hazard Analysis (JHA)
- Hazard Identification & Risk Assessment (HIRA)
- Safe Work Method Statement (SWMS)
- Permit-to-Work (PTW) Supporting Documents
- Standard Operating Procedures (SOP)
- Emergency Response Plan (ERP)
- Toolbox Talk
- COSHH Assessment
Business type:
Corporates
•
Other
Industry:
Construction
•
Energy
•
Engineering
My Portfolio
FAQ
Do you provide site-specific documents?
Yes. Every document is prepared according to your project, activity, client requirements, and applicable standards.
Which industries do you support?
Construction, power plants, oil & gas, manufacturing, industrial facilities, warehouses, infrastructure, and utilities.
Are your documents editable?
Yes. You will receive fully editable Microsoft Word files. PDF versions can also be provided upon request.

