I will construction takeoffs from csi divisions boq and cost breakdown
About this Gig
Quantity Takeoff and BOQ prepared in CSI Divisions for fast, traceable bidding. I measure directly from your PDFs/DWGs using PlanSwift/Bluebeam and deliver a clean Excel (XLSX/CSV) with item codes, descriptions, quantities, units, wastage, and a clear cost breakdown (material, labor, equipment, markups if provided). You get linked markups/screenshots so every line is auditable.
What I cover: Architectural, Structural, and MEP scopes (finishes, doors/windows, concrete/rebar/formwork, steel, drywall/ceilings, flooring, paint, plumbing, HVAC, electrical). I also handle alternates, addenda, and change-order updates.
Deliverables:
CSI-formatted BOQ + summary tabs
Cost plan with assumptions/inclusions & exclusions
PDF of highlighted takeoff/markups
Supplier-ready CSV (on request)
Why choose me:
Contractor-ready formatting that saves estimator time
Double-check QA to minimize misses
Fast response, on-time delivery
What I need to start: drawings/specs, latest addenda, scope notes (inclusions, alternates), your preferred unit rates or Ill use benchmark pricing.
Extras available: 2448h rush, trade-by-trade split, vendor quote sheet, RFI list.
Lets turn your drawings into a winning, bid-ready
Building type:
Residential
•
Commercial
•
Office & workspace
Software:
Bluebeam
•
PlanSwift
•
CostX
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.

