I will do fast and accurate quantity takeoff, boq and cost estimation
Your Schedule and Takeoff Experts in One
About this Gig
Wrong numbers on a bid can cost you the contract or your profit margin. Neither is acceptable.
I am Saim, a Civil Engineer with BOQ and quantity takeoff experience on real infrastructure projects, including civil works on one of Pakistan's largest active mining developments.
What you get:
- Full quantity takeoff covering excavation, concrete, rebar, masonry and finishes
- Detailed material takeoff with unit measurements
- Cost estimation built on current market rates
- Clean Excel deliverable with built-in formulas
- Summary report for client or management review
How it works:
- You send drawings, specs and project scope
- I perform takeoffs and build up the rates
- You review and request tweaks
- Final delivery as Excel file plus summary
Why clients pick me over others: Most estimators work off templates. I work off drawings. Every takeoff is project-specific, measured properly, and built to hold up whether it is for bidding, budgeting or client submission.
Message me before ordering. I will tell you honestly what I need and what you will get back.
Building type:
Residential
•
Commercial
•
Office & workspace
Software:
Revit
•
PlanSwift
•
Microsoft Excel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
My Portfolio
FAQ
What files do you need to start?
Please share your project drawings (DWG/PDF), specifications, and any existing BOQ. If you have unit rates or a budget template, include those too.
Which units do you work in?
I can work in both metric (m, m²) and imperial (ft, ft²). Just let me know your preference when you order.
Can you handle large or multi‑phase projects?
Yes, my Standard and Premium packages cover up to 25,000 sq.ft. and beyond, with detailed takeoffs and budgeting for complex builds.
What if I need a faster delivery?
Choose my “Extra Fast Delivery” gig extra at checkout, and I’ll prioritize your project for a speedier turnaround.

