I will provide california adu structural calculations and permit engineering

S
semasasatowaku
S
semasasatowaku
Michael S.

About this gig

Struggling to get your California ADU plans approved? Most permit delays don't come from bad design they come from structural calculations that fail plan check. One missing shear wall detail or a miscalculated seismic load, and your permit sits in corrections for weeks.


I'm a licensed structural engineer providing PE-stamped calculations built specifically for California ADU permitting no templates, no shortcuts. Every package includes full gravity and lateral load analysis: foundation design, beam/header sizing, floor and roof framing, shear wall layout, holdown and connection design, and wind/seismic load calculations engineered to current CBC and ASCE 7 requirements.


Already have plan check corrections? I'll review the reviewer's comments, revise the calculations, and hand you a resubmittal-ready package fast.


Clients keep coming back because I don't just crunch numbers, I build packages that pass. Clean documentation, fast responses, and calculations plan checkers approve without a fight. Contractors, designers, and ADU companies trust me because I get their permits through the first time.


Message me your plans today and let's get your ADU permit-ready.

Service verification and delivery style preference

Fiverr does not screen freelancers in this category. Please verify qualifications and discuss requirements with the freelancer before ordering, including any preferences regarding the use of AI tools.

Get to know Michael S.

Michael S.

Professional structural calculations engineer

  • FromUnited States
  • Member sinceAug 2026
  • Avg. response time1 hour
  • Languages

    English
Rejected Hawaii permit over missing structural calculations or an incomplete engineer letter? As a structural engineer, I prepare PE-stamped structural calculations and engineer letters built for Hawaii permit plans, Honolulu, Maui, Kauai, Hawaii County. matched to county-specific wind and code requirements, not generic templates. Clients return because submissions clear review the first time, not the second. Message me your project scope and let's get your Hawaii permit approved, right.