I will write UK rams, risk assessments and method statements for your job
NEBOSH Qualified RAMS and COSHH writer
About this Gig
Need RAMS to get your team on site, done properly?
I'm a NEBOSH-qualified operations supervisor with 20+ years in heavy industrial operations. I write RAMS as part of my day job for high-risk work: confined spaces, high-pressure water jetting, work at height, MEWPs, telehandlers, hazardous substances and contractor work.
What you get:
- Task-specific Risk Assessment (hazards, risk rating, controls in hierarchy order)
- Step-by-step Method Statement your crew can actually follow
- References to UK law: HSWA 1974, MHSWR 1999, CDM 2015, COSHH, PUWER, LOLER, Work at Height Regs
- Editable Excel or Word file + PDF
How it works:
1. Send me the job, site, crew size, plant and any client requirements
2. I draft, check and finalise your RAMS
3. You review it against your site and sign it off
Ideal for subcontractors, cleaning and maintenance firms, and sole traders who need RAMS accepted by a principal contractor. Written to UK law (outside the UK: see FAQ).
I use AI tools to speed up drafting. Every document is checked and finalised by me.
Business type:
Solopreneurs
•
SMBs
Industry:
Construction
•
Environmental
•
Manufacturing & storage
FAQ
What do you need from me?
The job, site type and area, dates, crew size and cards held, plant and tools, substances used, client or principal contractor requirements, and your company name and logo.
Is it site-specific?
It is written for the job you describe. You check it matches the site on the day and add anything I couldn't know.
Will principal contractors accept it?
It is written to UK standards (MHSWR, CDM 2015). Acceptance is the client's decision; revisions are included if they ask for changes.
Do you visit the site?
Yes, anywhere in the UK, as a paid extra. Most RAMS are written remotely from your job details.
Do you use AI?
Yes, to draft faster. Every line is checked and finalised by me, a NEBOSH-qualified supervisor.
Who is responsible for the RAMS?
You are, as the employer and duty holder. Review it, brief your team and sign it off before work starts.
What format?
Editable Word and PDF.
Can you write RAMS for sites outside the UK?
Yes, as a generic version based on UK law and good practice. You must check it against your local law and you are responsible for adapting and using it. I don't accept orders for sites in the USA or Canada.

