I will do quantity take off, material taking off, cost estimation, boq preparation
Reliable Civil Engineering Solutions Worldwide
About this Gig
Are you looking for accurate and reliable Quantity Take-Offs and BOQs for your construction project?
You are in the right place!
I am a Civil Planning Engineer with hands-on experience in preparing professional Quantity Take-Offs, Material Take-Offs, Cost Estimates, and BOQs for residential, commercial, and infrastructure projects.
My Services Include:
- Quantity Take-Off (Concrete, Steel, Masonry, Finishes, etc.)
- Material Take-Off
- Detailed BOQ Preparation
- Cost Estimation
- Bar Bending Schedules
- Excel-Based Take-Off Sheets
- Contractor & Client-Friendly Formats
What You Will Get:
- Accurate and well-organized quantities
- Editable Excel or PDF files
- Fast and reliable delivery
- Clear and professional reporting
Why Choose Me:
- Real construction project experience
- High accuracy and attention to detail
- On-time delivery
- Professional communication
NOTE: Please send your drawings (PDF, DWG) and project details before placing the order.
Building type:
Residential
•
Commercial
•
Other
Software:
CostX
•
Microsoft Excel
•
Other
Field of expertise:
Concrete
•
Masonry
•
Metals
•
Finishes
•
Earthwork
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
What information do you need to start the work?
I need architectural/structural drawings (PDF or DWG), project location, scope of work, and any specific measurement standards or formats you prefer.
What types of projects do you handle?
I work on residential houses, apartments, commercial buildings, villas, warehouses, and small infrastructure projects.
In which format will I receive the BOQ or take-off?
You will receive files in Excel and/or PDF format. Editable Excel sheets can also be provided on request.
Do you follow any standard measurement methods?
Yes. I can follow standard methods such as SMM, CESMM, NRM, or your company/client-specific format.
Can you include cost estimation with the BOQ?
Yes. I can prepare cost estimates using your provided rates or market-based approximate rates if requested.
Do you sign NDAs or keep files confidential?
Yes. All project files and data are kept 100% confidential.

