I will provide site grading, drainage, swppp, and sewage plan for florida projects


About this gig
Developing in Florida means FDEP scrutiny, strict WMD basin criteria, and local DRC reviews that reject incomplete submittals. I deliver remotely every document permit-ready the first time.
What's Covered:
Grading Plan:
Spot elevations
Proposed contours
Cut/fill analysis
Finish floor elevations
Swales & slope design
Positive drainage
Earthwork quantities
Grading sections & profiles
Erosion control grading
Driveway & parking lot grading
Drainage Plan & Calculations:
Pre/post runoff analysis
Time of concentration
Rational Method / SCS TR-55
Pipe & inlet sizing
Retention/detention pond
WQv & flood attenuation
Outfall structure
Bluespot analysis
Curve number (CN) calculation
Drawdown analysis
Recovery analysis
SFWMD / SWFWMD / SJRWMD
SWPPP:
NPDES CGP compliant
BMP selection & placement
Erosion & sediment control
BMP site map
Inspection checklist
Rainfall erosivity factor
Responsible party designations
Turbidity monitoring plan
Construction exit & inlet protection
FDEP-ready
Sewage & Sanitary:
Gravity mains & manholes
Cleanouts & invert elevations
Pipe slopes & sizing
Public system connection
Septic layout & setbacks
Force main & lift station layout
Message me now!!!!
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
Get to know Gladies K
Civil Engineer, Designer and Specialist
- FromUnited States
- Member sinceMay 2026
Languages
English, French
FAQ
Can these plans be submitted directly for an ERP or local permit?
Yes. Standard and Premium deliverables are ERP, DRC, and municipality permit ready. Requirements vary by county, confirm specific formatting with your local building department.
My project is in a FEMA flood zone, does that affect the scope?
Yes. Flood zone projects require BFE compliance, compensating storage, and floodplain encroachment review. Mention your flood zone designation and FIRM panel number when messaging me.
Are your plans compliant with Florida Water Management District requirements?
All plans follow applicable WMD Basis of Review SFWMD, SWFWMD, SJRWMD, or NWFWMD. SWPPP is prepared per FDEP NPDES CGP requirements.
Do you physically visit the site or work remotely?
Fully remote. I work from your provided survey, topo, or site plan. All deliverables are sent as .dwg and PDF files.
