I will create project plans, gantt charts, and cost estimation
Pro Civil Engineer
About this Gig
Are you planning a construction or civil engineering project but need professional scheduling and precise budgeting? Let us turn your blueprints into an industry-standard, executable plan.
Delays and budget overruns happen when a project lacks a solid framework. As specialists in Civil Engineering Project Planning and Cost Estimation, we utilize industry-leading tools like Primavera P6, Microsoft Project, and MS Excel to help contractors, developers, and engineers manage their projects flawlessly from groundbreaking to handover.
What We Offer:
- Advanced Project Scheduling: Developing professional schedules with Critical Path Method (CPM) analysis using Primavera P6 or MS Project.
- Accurate Material Takeoffs & Cost Estimation: Detailed, formula-driven breakdowns of concrete, rebar, earthwork, and finishes built in custom MS Excel sheets.
- Bill of Quantities (BOQ): Clean, professional preparation of BOQs organized by standard construction divisions.
- Work Breakdown Structure (WBS): Structuring your project phases (Substructure, Superstructure, MEP, Finishes) logically.
- Resource & Cost Loading: Tracking machinery, labor, and budget allocation directly within your preferred software.
Domain:
Business
Industry:
Agriculture
•
Architecture & interior design
Language:
English
My Portfolio
FAQ
In what formats will we receive the final files?
Depending on your package and preference, you will receive the native source files: .xer for Primavera P6, .mpp for Microsoft Project, or fully editable formula-backed .xlsx sheets for MS Excel, along with presentation-ready PDFs.
Can you link resources and costs to the schedule?
Yes. For our premium packages, we perform full resource loading and cost loading in Primavera P6 or MS Project to give you total control over your project's budget and manpower over time.
What do you need from us to start working?
We need your project’s architectural/structural drawings (PDF or CAD format), a general scope of work, expected start/end dates, and any specific material or resource constraints you have.

