I will do construction project management cost estimation and quantity surveying
Level 1
Has met certain performance criteria and shows strong potential in the marketplace.
Highly Responsive
Known for exceptionally quick replies
About this Gig
will do construction quantity takeoff, material takeoff, BOQ (bill of quantities), cost estimation, and quantity surveying for contractors using CSI MasterFormat / CSI divisions (Div 0149). Get a contractor-ready estimate + bid quantities in Excel + PDF with annotated markup plans.
CSI / MasterFormat estimating + takeoff (Divisions)
- Div 01 General Requirements (GCs, mobilization, temporary works)
- Div 02 Existing Conditions / Demolition (demo takeoff, removals)
- Div 03 Concrete (slabs, footings, rebar, formwork)
- Div 04 Masonry (CMU, brick, mortar, grout)
- Div 05 Metals (structural steel, misc metals)
- Div 06 Wood, Plastics & Composites (framing, sheathing, millwork)
- Div 07 Thermal & Moisture Protection (roofing, waterproofing, insulation)
- Div 08 Openings (doors, windows, hardware)
- Div 09 Finishes (drywall, painting, flooring, ceiling)
- Div 10 Specialties (toilet accessories, signage, lockers)
- Div 11 Equipment (allowances, vendor items if provided)
- Div 12 Furnishings
- Div 13 Special Construction (pre-engineered, specialty systems)
- Div 21 Fire Suppression
- Div 22 Plumbing
- Div 23 HVAC
Message me before ordering if you have multiple buildings, addendums, or urgent bids.
Building type:
Residential
•
Commercial
•
Industrial
Software:
Bluebeam
•
PlanSwift
•
CostX
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
