I will draw traffic control plan tcp management plan for city permit work zone plan

United Kingdom

I speak English

It's all about bringing it to life!

Hi, I'm Wade. I turn survey data into clear, buildable road designs in AutoCAD Civil 3D. Too many road drawings arrive without contours, quantities or a clear scope, and projects stall. I fix that. Yo...
About this Gig

Your crew is ready, but the city sent your permit back. The traffic control plan was missing signs, the taper lengths were wrong, or the detour was not shown. Every day of delay costs you money.


I draw TCP that are built to pass review the first time.


What you get:

  • Lane closure, shoulder closure and road closure plan layouts
  • Work zone traffic control drawn to MUTCD typical applications
  • Detour plan with signed routes for vehicles, cyclists and pedestrians
  • Sign and device schedule with spacing and taper lengths
  • Maintenance of traffic plan sheets for multi-phase jobs
  • UK traffic management plan to Chapter 8 for UK projects
  • Swept path analysis for trucks and site access (add-on)


You receive a PDF ready to submit, plus the editable DWG.


If your city or council asks for changes, I correct the plan for free within 14 days. You are not paying twice for the same permit.


What I need: the site address or a marked map, the work area, your work hours, and any city template or standard.


Send me your location and I will confirm the plan type before you order.

Project scale:

City

Building type:

Commercial

•

Industrial

•

Infrastructure

Material speciality:

Concrete

•

Steel

Delivery style preference

Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.

Related tags