I will do drywall takeoff and interior finishes cost estimation
Expertise in Android, IOS and Flutter Application Development
About this Gig
I will prepare a drywall and interior finishes takeoff and cost estimate from your drawings.
This gig covers Division 09 finishes only: drywall, paint, ceilings, flooring, tile, and wall finishes. A civil engineer checks the quantities before delivery.
What I estimate:
- Drywall and gypsum board
- Metal stud and wood backing shown for finishes
- Painting and coatings
- Acoustical and gypsum ceilings
- Flooring: tile, vinyl, carpet, wood, epoxy
- Wall tile and wall coverings
- Finish schedule items shown on your plans
What you receive:
- Room by room or area by area quantities
- Material list with waste
- Labor and material cost on Standard and Premium
- Excel file on every package
- PDF summary and marked-up plans on Standard and Premium
Packages:
- Basic, $40: one room or one area, quantities only, 2 days
- Standard, $120: one floor or one unit, all finishes, costs, Excel + PDF, 4 days
- Premium, $250: full building, room by room, labor and material, 7 days
Not included:
- Rough carpentry
- Doors and windows
- Millwork
- Plumbing, HVAC, and electrical
Send finish plans or floor plans, a finish schedule if you have one, and the project city. Message me before ordering.
Building type:
Residential
•
Commercial
•
Office & workspace
Software:
Bluebeam
•
PlanSwift
•
Microsoft Excel
Delivery style preference
Please inform the freelancer of any preferences or concerns regarding the use of AI tools in the completion and/or delivery of your order.
FAQ
What drawings do you need?
A PDF floor plan is enough for Basic. A full interior needs the finish plan or finish schedule as well.
Do you include framing?
Only backing or studs shown for drywall and finishes. Structural framing is a separate trade.
Do you visit the site?
No. The estimate is based on the drawings you send.
Are prices local to my project?
On Premium, yes, when you share the project city. On Standard I can use local rates if you add Local price update, or I will state the rate source used.
What is not included?
Doors, windows, millwork, plumbing, HVAC, and electrical.

